March 2007 Referendum
Sample 2007 Ballot
Task Force Information
TRAFFIC ANALYSIS
FDOT Central Florida Commuter Rail –
Environmental Assessment Chapter 4 Transportation Impacts
(December 2006)
Click here to view PDF
TranSystems Memorandum –
Winter Park Commuter Rail StationTraffic Analysis
(February 1, 2008)
Click here to view PDF
ESTIMATED COSTS
One-time capital cost to be paid with federal funding estimated based on the FDOT 60 percent design, including a 20 percent
contingency.
(Received by the City of Winter Park on January 27, 2009.)
Click here to view PDF
Annual operation and maintenance based on estimated boardings from the Winter
Park stop, not including the 30 percent annual contribution from Orange County.
(Received by the City of Winter Park on December 21, 2007.)
Click here to view PDF
MetroPlan Orlando Board Finance Committee’s report
on Regional Dedicated Transportation Funding
DESIGN CONCEPTS
Final three SunRail train designs (September 1, 2010)
100 percent Commuter Rail Stop Design
1st Public Design Work Session
(held on January 10, 2008)
PowerPoint Presentation
Summary Report
2nd Public Design Work Session
(held on March 19, 2008)
Agenda
Power Point Presentation
(includes architectural sketches)
Comment Form
Tabulation Form
City Commission Meeting
Craftsman Style Canopy Architectural Design Concepts
(held on September 8, 2008)
Proposed Canopies with Breezeway
thru Amtrak Building
Proposed Canopies without Breezeway
thru Amtrak Building
City Commission Meeting
FDOT Update (held on August 11, 2008)
FDOT PowerPoint Presentation
HELPFUL WEB SITES
Visit the FDOT Central Florida Commuter Rail Web site
Visit the
My Region Web site and their related links:
News & Press
October 2008 Central Florida Citizen Survey
Quite Zone Evaluation
Transit Savings Calculator